Description

The proposed project consists of the reconstruction and widening of approximately 2.3 miles of Morris Road in Columbus, Georgia within Muscogee County. The project extends from Buena Vista Road to Forrest Road through a predominantly residential corridor. The project will widen Morris Road from two lanes to three lanes to provide a center two-way left-turn lane. Additionally, curb and gutter and a closed drainage system will be installed to control storm water. A 5-foot sidewalk and 10-foot shared-use path will be constructed to provide connectivity to nearby neighborhoods, parks, and local businesses. Two (2) mid-block crossings will be installed with rectangular rapid flashing beacons to facilitate safe pedestrian crossing of Morris Road. At the intersection of Morris Rd and Forestside Dr. S, a single-lane, elliptical, urban roundabout is proposed to channelize traffic entering and exiting Forestside Dr. and to improve flow to and from the Edgewood Park parking lot. The project will require coordination with the adjacent roundabout projects located at Ace Way Drive (PI# 0010927) and Forrest Road. At the intersection of Shep Street and Morris Road, the profile of Morris Road will be raised approximately 3.5-ft to 4.5-ft to match the elevation of the adjacent at-grade railroad crossing.

Details

Title Description
Project Length 2.3 miles
Roadway Typical Section
Existing
  • 2, 9-foot to 11-foot lanes.
  • Variable-width grassed shoulders are provided throughout the corridor sidewalk facilities are present only at select locations and are not continuous along the entire length of the project.
Proposed
  • Two 11-foot travel lanes.
  • 11-foot two-way left-turn lane
  • 10-ft shared-use path alternating sides
  • 5-ft sidewalk alternating sides, not continuous
  • Curb-and-gutter both sides
Posted/Design Speed 35 MPH
Costs $15.4 million (engineer’s opinion of probable costs)
Number of Impacted Parcels 94 (estimated)
Potential Displacements Two commercial
Utilities Relocation in utility easement. Utilities include overhead cable, electric, and telephone and underground cable, electric, gas, telephone, sewer, and water.
Target Start Date 1st Quarter of 2029
Estimated Construction Time 24 months
Traffic Control During Construction Traffic control will be utilized to maintain traffic during construction. Some temporary lane closures may be required during stage construction where grade changes are significant.

Proposed Safety and Operational Improvements on County Road (CR) 2249/Williams Road from I-185 to Frank Houser Avenue/Builders

Public Info Open House:

Thursday, Sept. 10, 2026 5:00 pm - 7:00 pm
Northside Recreation Center
2010 American Way
Columbus, GA 31909

Online:

Project website open through September 25, 2026
Site link: https://bit.ly/TIA-Muscogee-WilliamsRoad

All questions and comments submitted through the website will receive responses from the project's engineers and designers.

Transportation Alternatives Program (TAP) Call for Projects

Monday August 31, 2026

The Columbus-Phenix City Transportation Study (C-PCTS) is accepting applications for eligible projects through the Transportation Alternatives Program (TAP). Eligible applicants are encouraged to submit projects that support pedestrian, bicycle, and other alternative transportation improvements within the C-PCTS planning area. The deadline for applications is September 10, 2026 at COB.

FY 2027 Unified Planning Work Program (UPWP)

The FY 2027 Unified Planning Work Program (UPWP) outlines the transportation planning activities and priorities to be carried out by the Columbus-Phenix City Metropolitan Planning Organization (MPO) in cooperation with the Federal Highway Administration (FHWA), the Federal Transit Administration (FTA), the Alabama Department of Transportation (ALDOT), the Georgia Department of Transportation (GDOT), public transit operators, and local member governments. The UPWP serves as the MPO’s annual work program and budget document, identifying planning studies, program administration, and transportation planning activities to be undertaken within the metropolitan planning area. This work program supports a continuing, cooperative, and comprehensive (3C) planning process that ensures transportation investments are based on regional needs, sound technical analysis, and coordination among federal, state, and local partners.

Transportation Alternatives Program (TAP) Call for Projects

Friday March 06, 2026

The deadline for submitting applications for the current Transportation Alternatives Program (TAP) Call for Projects has been extended. Applications originally due on February 26, 2026 will now be accepted until March 27, 2026 at COB. This extension provides additional time for eligible applicants to complete and submit the required materials. All other application requirements and evaluation criteria remain unchanged. Please see the updated notice below for additional information.

Columbus Safety Action Plan Development

Monday August 18, 2025

CCG is hosting a public meeting to present draft countermeasure project and policy recommendations to address safety needs on high injury corridors in Columbus. The community is encouraged to attend the meeting to provide input into the plan!

Public Meeting
Tuesday, September 16, 2025, 4:00-6:00 pm
Columbus Public Library
3000 Macon Road
Columbus, GA 31906

columbus safety action plan qr code link

Transportation Division

Will Johnson
Planning Director
wjohnson@columbusga.org
(706) 653-4116

Bailey Borkat
Senior Transportation Planner
Borkat.Bailey@columbusga.org
(706) 225-3938

David Cooper
GIS Technician
dcooper@columbusga.org
(706) 225-3976

LaGranita Davis
Administration Assistant
davis.lagranita@columbusga.org
(706) 225-3935

Altemese Wilson
Senior Transportation Planner
awilson@columbusga.org
(706) 225-3939

Planning Division

John Renfroe
Assistant Planning Director
jrenfroe@columbusga.org
(706) 225-3937

Rex Wilkinson
Senior Planner
wilkinson.rex@columbusga.org
(706) 225-3928

Morgan Shepard
Principal Planner / Zoning Administrator
shepard.morgan@columbusga.org
(706) 225-3940

Claire Mitchell
Historic Preservation Planner
mitchell.claire@columbusga.org
(706) 225-3941

Copyright 2026 by Columbus Consolidated Government Privacy Statement